C3 Metals Intersects 51.1 Metres at 0.54% Copper and 0.31 g/t Gold (0.86% CuEq), Including 18.0 Metres at 1.08% Copper and 0.76 g/t Gold (1.85% CuEq) in Second Drill Hole at Khaleesi Copper Project, P

Go back to C3 Metals Intersects 51.1 Metres at 0.54% Copper and 0.31 g/t Gold (0.86% CuEq), Including 18.0 Metres at 1.08% Copper and 0.76 g/t Gold (1.85% CuEq) in Second Drill Hole at Khaleesi Copper Project, P
(AMEX: CUAUF) Delayed: 0.55 --0 (-0%)
Previous Close $0.55    52 Week High
Open $0.55    52 Week Low
Day High $0.55    P/E N/A 
Day Low $0.55    EPS
Volume 320,152       

Freeport-McMoran Cp & Gld (NYSE: FCX) Delayed: 68.68 -0.38 (0.55%)
Previous Close $69.06    52 Week High $14.26 
Open $69.95    52 Week Low $3.52 
Day High $70.62    P/E 26.02 
Day Low $68.02    EPS $2.64 
Volume 17,963,753