Canada Nickel Announces Initial Resources at Midlothian and Bannockburn Projects
Get Alerts CNC Hot Sheet
Join SI Premium – FREE
Highlights:
- Midlothian delivers highest nickel grade: 595 million tonnes (Mt) Inferred Resource at 0.28% nickel;
Bannockburn resource established: 63 Mt Indicated Resource at 0.28% nickel and129 Mt Inferred Resource at 0.27% nickel.Timmins Nickel District expanded: Eight deposits now total 3.9 billion tonnes (Bt) Measured & Indicated Resources at 0.24% containing 9.4 Mt of contained nickel and 4.9 billion tonnes (Bt) Inferred Resources at 0.23% containing 11.5 Mt of contained nickel
The Company has published mineral resource estimates for eight of its properties in the
The Company continues to show the potential of its property package in the
Table 1. Total Measured, Indicated and Inferred Resources on Canada Nickel Properties.
M&I | Inferred | Exploration Target | |||||||
Project | Geophysical | Resource | Resource (Bt) | Ni % | Contained | Resource (Bt) | Ni % | Contained | Tonnage (Bt) |
Footprint (km2) | Date/Target | Nickel (Mt) | Nickel (Mt) | ||||||
Crawford | 1.6 | Oct-23 | 2.56 | 0.24 | 6.03 | 1.69 | 0.22 | 3.73 | - |
Reid | 3.9 | Dec-24 | 0.59 | 0.24 | 1.43 | 0.99 | 0.23 | 2.24 | 0.9-2.1 |
Mann W | 3.4 | Jun-25 | 0.41 | 0.23 | 0.95 | 0.60 | 0.22 | 1.31 | 0.5-1.0 |
Mann CE | 3.1 | Jul-25 | 0.24 | 0.22 | 0.52 | 0.54 | 0.21 | 1.15 | 0.6-2.0 |
0.4 | Jul-24 | 0.08 | 0.25 | 0.20 | 0.36 | 0.25 | 0.89 | - | |
Texmont | 0.1 | Jul-25 | 0.04 | 0.29 | 0.11 | 0.05 | 0.25 | 0.14 | - |
0.4 | Dec-25 | 0.06 | 0.28 | 0.18 | 0.13 | 0.27 | 0.34 | 0.06-0.35 | |
Midlothian | 1.7 | Dec-25 | - | - | - | 0.59 | 0.28 | 1.68 | 0.43-0.98 |
TOTAL | 15.0 | 3.98 | 0.24 | 9.42 | 4.95 | 0.23 | 11.48 | ||
Midlothian Mineral Resource Estimate
The Midlothian Project is 110 km south of the Company's flagship Crawford Nickel Sulphide Project ("Crawford") and approximately 27 km southwest of the town of
For the initial MRE, a total of 9,268 metres of core drilling from 22 drill holes were utilized to calculate the Midlothian Inferred Resource category as summarized in Table 2. All drill holes belong to Canada Nickel and were drilled in the 2023, 2024 and 2025 drilling campaigns.
Inferred Resources total 595 million tonnes grading 0.28% nickel, for a total of 1.68 million tonnes of contained nickel. The approximate dimensions of the Midlothian MRE are 2.5 kilometres long, up to 520 metres wide, extending to 500 metres deep, and remaining open to the east and at depth. An additional 434 to 980 million tonnes grading between 0.25% and 0.27% nickel remain as an Exploration Target1, pending further drilling. This Exploration Target is based on core drilling by the Company, the geophysical survey on the Project, and the understanding and calculation of the current Midlothian MRE.
The Exploration Target was derived by modelling the identified nickel sulphide mineralization within the current estimation envelope but outside of the current MRE area. The volume of the modelled Exploration Target area determines the potential tonnage statement in the Exploration Target. The grade range given in the Exploration Target is determined with consideration to the drill core results within the modelled Exploration Target area, consideration of the geological setting in a well understood nickel deposit type where grades are observed and well understood and based on the experience of the Company and the Qualified Persons. The potential tonnages and grades are conceptual in nature and are based on drill holes and geophysical results that define the approximate length, thickness, depth and grade of the Exploration Target. There has been insufficient exploration to define a current mineral resource and the Company cautions that there is a risk that further exploration will not result in the delineation of a current mineral resource.
The Midlothian MRE was prepared by Caracle Creek International Consulting Inc. and its sub-consultant L&M Geociencias, in accordance with CIM Estimation of Mineral Resources & Mineral Reserves Best Practice Guidelines (2019) and CIM Definition Standards for Mineral Resources & Mineral Reserves (2014). A Technical Report in support of the Mineral Resource Estimate will be filed on SEDAR+ (www.sedarplus.ca) within 45 days of this news release.
1the potential quantity and grade is conceptual in nature; there has been insufficient exploration to define a mineral resource; it is uncertain if further exploration will result in the target being delineated as a mineral resource (also see below). |
Table 2. Initial Total Mineral Resource Estimate (in-pit resources) for the Midlothian Nickel Sulphide Deposit.
Mineral Resource Estimate | Contained Metal | |||||||||||||
Class | Tonnage | Ni | Co | Fe | Cr | Pd | Pt | Ni | Co | Fe | Cr | Pd | Pt | |
Inferred | 595.3 | 0.28 | 0.011 | 4.72 | 0.18 | 0.003 | 0.004 | 1,684 | 64.4 | 28.1 | 1,057 | 56.3 | 69.9 | |
Notes to Table 2:
- The independent Qualified Person for the Mineral Resource Estimate ("MRE"), as defined by National Instrument 43-101 ("NI 43-101"), is Dr.
Scott Jobin-Bevans (P.Geo ., PGO #0183), of Caracle Creek International Consulting Inc. The effective date of the Mineral Resource Estimate isDecember 15, 2025 . - The quantity and grade of reported Inferred Resources in this MRE are uncertain in nature and there has been insufficient exploration to define these Inferred Resources as Indicated or Measured. However, it is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.
- A cut-off grade of 0.10% Ni was used to define potentially economic material for inclusion within the MRE. Cut-offs were determined on the basis of core assay geostatistics and drill core lithologies for the deposit, and by comparison to analogous nickel deposit types.
- Geological and block models for the MRE used data from a total of 22 surface drill holes, completed by Canada Nickel in 2023, 2024 and 2025. The drill hole database was validated prior to resource estimation and QA/QC checks were made using industry-standard control charts for blanks, core duplicates and commercial certified reference material inserted into assay batches by Canada Nickel and by comparison of umpire assays performed at a second laboratory.
- Estimates have been rounded to two significant figures.
- The MRE was prepared following the CIM Estimation of Mineral Resources & Mineral Reserves Best Practice Guidelines (
November 29, 2019 ) and the CIM Definition Standards for Mineral Resources & Mineral Reserves (May 19 , 2014). - The geological model as applied to the MRE comprises three mineralized domains hosted by variably serpentinized ultramafic rocks: a higher-grade core (dunite), a slightly lower grade halo (transitional dunite) and a lower grade marginal domain (peridotite). Individual wireframes were created for each domain in Leapfrog Geo 2025.2 software.
- A 20 m x 20 m x 15 m block model was created, and samples were composited at 7.5 m intervals. Grade estimation from drill hole data was carried out for Ni, Co, Fe, Cr, S, Pd and Pt using the Ordinary Kriging interpolation method in Isatis 2024.12 software.
- The MRE has been constrained by a conceptual pit envelope that was developed using the following optimization parameters. Metal prices used were
US$21,000 /t nickel,US$40,000 /t cobalt,US$325 /t iron,US$3,860 /t chromium,US$1,350 /oz palladium, andUS$1,150 /oz platinum. Different pit slopes were used for each layer (in degrees): 9.5 in clay, 11.3 in sand & till, and 45.0 in rock. Exchange rate utilized was C$ =US$0.76 . Mining costs utilized different values for overburden (clay, gravel), and rock mining, ranging fromC$1.64 toC$4.32 /t mined. Processing and G&A costs for a 120 ktpd operation (similar to the ultimate scope of Crawford) have been estimated at C$8.20/t. Based on the range of grade and ratio of sulphur to nickel, calculated recovery averages 39% for Ni, 6% for Co, 56% for Fe and 25% for Cr, 32% for Pd and 12% for Pd. - Grade estimation was validated by comparison of input and output statistics (Nearest Neighbour and Inverse Distance Squared methods), swath plot analysis, cross-plots of declustered samples against the nearest OK estimate, and by visual inspection of the assay data, block model, and grade shells in cross-sections.
- Density estimation was carried out for the mineralized domains using the Ordinary Kriging interpolation method, based on 947 specific gravity measurements collected during the core logging process, using the same block model parameters of the grade estimation. As a reference, the average estimated density value within dunite is 2.56 g/cm3 (t/m3), the transitional dunite domain yielded an average of 2.61 g/cm3 (t/m3), while the peridotite domain is 2.76 g/cm3 (t/m3).
Next Steps at Midlothian Nickel Sulphide Project:
- A technical report with respect to the MRE disclosed today will be filed within 45 days of this news release.
- Infill drilling at the property will aim to increase and upgrade Inferred Resources to Indicated Resources in the next drilling campaign.
- Mineralogical and metallurgical analysis will continue to better understand and estimate metal recoveries.
Bannockburn Mineral Resource Estimate
The Bannockburn Project is 100 km southeast of the Company's flagship Crawford Nickel Sulphide Project ("Crawford"). The area of the geophysical target covered by the Bannockburn MRE represents approximately 70% of its total target geophysical area.
For the initial MRE, a total of 8,528 metres of core drilling from 25 drill holes were utilized to calculate the
Indicated Resources total 63 million tonnes grading 0.28% nickel, for a total of 0.18 million tonnes of contained nickel and Inferred Resources total 129 million tonnes grading 0.27% nickel, for a total of 0.34 million tonnes of contained nickel. The approximate dimensions of the Bannockburn MRE are 1.2 kilometres long, up to 330 metres wide, extending to 500 metres deep, and remaining open in all directions.
Drilling at
The Bannockburn MRE was prepared by Caracle Creek International Consulting Inc. and its sub-consultant L&M Geociencias, in accordance with CIM Estimation of Mineral Resources & Mineral Reserves Best Practice Guidelines (2019) and CIM Definition Standards for Mineral Resources & Mineral Reserves (2014). A Technical Report in support of the Mineral Resource Estimate will be filed on SEDAR+ (www.sedarplus.ca) within 45 days of this news release.
Table 3. Initial Total Mineral Resource Estimate (in-pit resources) for the Bannockburn Nickel Sulphide Deposit.
Mineral Resource Estimate | Contained Metal | |||||||||||||
Class | Tonnage | Ni | Co | Fe | Cr | Pd | Pt | Ni | Co | Fe | Cr | Pd | Pt | |
Indicated | 63.2 | 0.28 | 0.009 | 3.79 | 0.11 | 0.006 | 0.006 | 179.7 | 5.9 | 2.4 | 67.3 | 12.1 | 12.2 | |
Inferred | 129.0 | 0.27 | 0.010 | 4.51 | 0.15 | 0.006 | 0.006 | 342.9 | 12.6 | 5.8 | 0.15 | 24.2 | 25.8 | |
Notes to Table 3:
- The independent Qualified Person for the Mineral Resource Estimate ("MRE"), as defined by National Instrument 43-101 ("NI 43-101"), is Dr.
Scott Jobin-Bevans (P.Geo ., PGO #0183), of Caracle Creek International Consulting Inc. The effective date of the Mineral Resource Estimate isDecember 15, 2025 . - The quantity and grade of reported Inferred Resources in this MRE are uncertain in nature and there has been insufficient exploration to define these Inferred Resources as Indicated or Measured. However, it is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.
- A cut-off grade of 0.10% Ni was used to define potentially economic material for inclusion within the MRE. Cut-offs were determined on the basis of core assay geostatistics and drill core lithologies for the deposit, and by comparison to analogous nickel deposit types.
- Geological and block models for the MRE used data from a total of xx surface drill holes, completed by Canada Nickel in 2023 and 2024. The drill hole database was validated prior to resource estimation and QA/QC checks were made using industry-standard control charts for blanks, core duplicates and commercial certified reference material inserted into assay batches by Canada Nickel and by comparison of umpire assays performed at a second laboratory.
- Estimates have been rounded to two significant figures.
- The MRE was prepared following the CIM Estimation of Mineral Resources & Mineral Reserves Best Practice Guidelines (
November 29, 2019 ) and the CIM Definition Standards for Mineral Resources & Mineral Reserves (May 19 , 2014). - The geological model as applied to the MRE comprises two mineralized domains hosted by variably serpentinized ultramafic rocks: a higher-grade core (dunite), and a lower grade halo (transitional dunite). Individual wireframes were created for each domain in Leapfrog Geo 2025.1 software.
- A 20 m x 20 m x 15 m block model was created, and samples were composited at 7.5 m intervals. Grade estimation from drill hole data was carried out for Ni, Co, Fe, Cr, S, Pd and Pt using the Ordinary Kriging interpolation method in Isatis 2024.12 software.
- The MRE has been constrained by a conceptual pit envelope that was developed using the following optimization parameters. Metal prices used were
US$21,000 /t nickel,US$40,000 /t cobalt,US$325 /t iron,US$3,860 /t chromium,US$1,350 /oz palladium, andUS$1,150 /oz platinum. Different pit slopes were used for each layer (in degrees): 9.5 in clay, 11.3 in sand & till, and 45.0 in rock. Exchange rate utilized was C$ =US$0.76 . Mining costs utilized different values for overburden (clay, gravel), and rock mining, ranging fromC$1.82 toC$4.61 /t mined. Material atBannockburn would be treated in a 120 ktpd operation (similar to the ultimate scope of Crawford). Ore Transportation, Processing and G&A costs for such an operation have been estimated at C$13.50/t. Based on the range of grade and ratio of sulphur to nickel, calculated recovery averages 49% for Ni, 10% for Co, 55% for Fe, 28% for Cr, 41% for Pd and 16% for Pd. - Grade estimation was validated by comparison of input and output statistics (Nearest Neighbour and Inverse Distance Squared methods), swath plot analysis, cross-plots of declustered samples against the nearest OK estimate, and by visual inspection of the assay data, block model, and grade shells in cross-sections.
- Density estimation was carried out for the mineralized domains using the Ordinary Kriging interpolation method, based on 454 specific gravity measurements collected during the core logging process, using the same block model parameters of the grade estimation. As a reference, the average estimated density value within dunite is 2.55 g/cm3 (t/m3), while the transitional dunite domain yielded an average of 2.61 g/cm3 (t/m3).
Next Steps at Bannockburn Nickel Sulphide Project:
- A technical report with respect to the MRE disclosed today will be filed within 45 days of this news release.
- Exploration drilling at the property will include an extension into the peridotite bodies adjacent to the main dunite body. The increase in volume and better morphology of the deposit could increase resources significantly.
- Mineralogical and metallurgical analysis will continue to better understand and estimate metal recoveries.
Assays, Quality Assurance/Quality Control and Drilling
Qualified Person and Data Verification
The magnetic geophysical images shown in this news release were created from Canada Nickel's interpretation of datasets provided by the Ontario Geological Survey.
References
Naldrett, A.J., and Lightfoot, P.C., 1993, Ni-Cu-PGE ores of the Noril'sk region,
Lesher, C.M. and Thurston, P.C., 2002, A Special Issue Devoted to the Mineral Deposits of the
About Canada Nickel Company
Canada Nickel Company Inc. is advancing the next generation of nickel-sulphide projects to deliver nickel required to feed the high growth electric vehicle and stainless-steel markets. Canada Nickel Company has applied in multiple jurisdictions to trademark the terms NetZero Nickel™, NetZero Cobalt™, NetZero Iron™ and is pursuing the development of processes to allow the production of net zero carbon nickel, cobalt, and iron products. Canada Nickel provides investors with leverage to nickel in low political risk jurisdictions. Canada Nickel is currently anchored by its 100% owned flagship Crawford Nickel-Cobalt Sulphide Project in the heart of the prolific
For further information, please contact:
CEO
Phone: 647-256-1954
Email: [email protected]
Cautionary Note and Statement Concerning Forward Looking Statements
This press release contains certain information that may constitute "forward-looking information" under applicable Canadian securities legislation. Forward looking information includes, but is not limited to, the potential of the Bannockburn Nickel Sulphide Project, timing for filing a technical report in support of the Mineral Resource Estimate, the significance of drill results, the ability to continue drilling, the impact of drilling on the definition of any resource, timing and completion (if at all) of additional mineral resource estimates, the potential of the
View original content to download multimedia:https://www.prnewswire.com/news-releases/canada-nickel-announces-initial-resources-at-midlothian-and-bannockburn-projects-302645767.html
SOURCE Canada Nickel Company Inc.
Serious News for Serious Traders! Try StreetInsider.com Premium Free!
You May Also Be Interested In
- C1Secure Launches SmartRAMP 20x, a ServiceNow-Native Platform Built for the FedRAMP 20x Model
- FocalPoint and STMicroelectronics enter into a commercial agreement to deliver enhanced GNSS reliability for automotive applications
- LAURA GELLER BEAUTY'S SPACKLE SKIN PERFECTING PRIMER: HYDRATE EARNS NATIONAL ECZEMA ASSOCIATION SEAL OF ACCEPTANCE; BRAND LAUNCHES NEW CAMPAIGN FEATURING FRAN DRESCHER
Create E-mail Alert Related Categories
PRNewswire, Press ReleasesSign up for StreetInsider Free!
Receive full access to all new and archived articles, unlimited portfolio tracking, e-mail alerts, custom newswires and RSS feeds - and more!



Tweet
Share